there is also 8000 feet of open ballast, north to ball inn farm infill near chelwood bridge roundabout
progress to date has seen major cutting back and grading works, (ú1200)the restoration of missing waiting shelter plinth/abutment stonework (ú600) and rebuilding of 6 out of 39 down platform paling fence panels, each 8'9". (ú300)
all of the 7 coach down platform top will be exposed soon revealing the 1930 rebuilt concrete face. the 1890 box locking room will also be dug out along with resetting of surviving 1930 concrete fence uprights.
outline planning for a ú50K teenage playground/skate park on the lower yard/frys bottom trackbed next to the 1981 built youth club will free up the 4500 ton infilled and grassed over 'tween platforms in a quarter acre "land swap" to be able to be dug out with weedproof matting and track following, this area being the only current "leisure area"