This is the original forum of the Bristol Railway Archive that existed between 2003 and 2013. I finally rescued it after it seemed unrecoverable after a large crash. I have made it available for viewing. It is locked, all posts to the new version please!
Engineering work between Clifton Down and Severn Beach from 10.00hrs on Monday 26 February to 14.00hrs on Friday 2 March 2007
Start date: Monday 26 February 2007
End date: Friday 2 March 2007
Route Affected: Weston-super-Mare - Bristol Temple Meads - Clifton Down - Avonmouth - Severn Beach
TOC/s Affected: First Great Western
Description: First Great Western services between Weston-super-Mare/Bristol Temple Meads and Avonmouth/Severn Beach are replaced by road transport between Bristol Temple Meads and Avonmouth/Severn Beach
James, of course there should be through trains linking the two Riviera resorts of Bristol "El Costa Severn Bahia" and "El Costa Weston Bahia the tourist industry of the two would collapse with out it!!!!!!!!!!!!!