Page 1 of 1

Tytherington Trip

Posted: Tue Oct 07, 2008 10:57 pm
by stumpytrain
Hi chaps,

I'm told they'll be a trip to Tytherington in the morning (08 October 08), they're bring stone out by rail. Not sure if any others will run in the next few days, no doubt the Gen masters will have more details!

Alex

Posted: Wed Oct 08, 2008 2:25 pm
by stumpytrain
Erm, the engine never appeared. Might happen tomorrow now... We'll see! :lol:

Posted: Wed Oct 08, 2008 9:51 pm
by James
It's appeared on the system for tomorrow, although, if I recall correctly, the last time they tried to send something up the branch the crossing equipment failed and they had to turn back. Hope it's fixed!

Posted: Wed Oct 08, 2008 9:59 pm
by tonyperks
what times ?

Posted: Wed Oct 08, 2008 11:54 pm
by James
mr_37701 wrote:Rare freight


Thu: 6Z24 0545 Westbury-Tytherington Quarry, 6Z25 1002 Tytherington to Acton via Box. Last quarry train ran approx July 07.

Posted: Thu Oct 09, 2008 1:59 pm
by yowie
At 1245 today the train looked fully loaded and ready to depart Tytherington.

Posted: Thu Oct 09, 2008 5:35 pm
by tonyperks
Here are a couple of shots of the train, headed by 59204 and loaded to 18JHA hopper wagons:
Image
At Iron Acton
Image
And coming off the branch at Yate.

Still problems with crossings, Being worked manually, another train tomorrow, both trains destined for olympic Village in London.

Posted: Thu Oct 09, 2008 7:49 pm
by stumpytrain
tonyperks wrote:Still problems with crossings, Being worked manually
Hopefully a few more trips will knock the rust off the railhead!

Alex

Posted: Fri Oct 10, 2008 10:19 am
by tonyperks
stumpytrain wrote:
tonyperks wrote:Still problems with crossings, Being worked manually
Hopefully a few more trips will knock the rust off the railhead!

Alex
Not just rust, Alex, 1 inch saplings standing in the 4 foot!, At Iron Acton there was a clearance crew out after complaints from the train crew about trees striking the loco's screen whilst traversing the branch(no pun intended). :P