I was going to go off tangent on the Thornbury thread but then thought it might be better to start a new one.in the Thornbury Railway thread tonyperks wrote:
The Biggest hurdle I feel would be the pathing of more trains into the already busy Bristol-Birminham line, let alone the lack of rolling stock to run it.
We are still suffering from the "rationalisation" programme from the 1960s and 1970s and nobody in power seems to want to do anything about it.
Tony was talking about the possibility or otherwise of pathing trains from the Thornbury branch onto the Bristol-Birmingham main line. In my neck of the woods, the campaign to reopen Corsham station was scuppered by FGW when they withdrew the Bristol-Oxford service, pleading that they needed the paths to run HSTs on the Londons. The proposal to reopen Wootton Bassett went west for the same reason
Some years ago I was at BTM waiting for a train to Chippenham, and there was a cracked rail somewhere around Keynsham. The entire Bristol to Bath line was being run as a single line until the Engineers had finished, because there is not a single crossover these days between Bath and Bristol.
It is not beyond the realms of possibility for capacities to be increased by means of passing loops and, where there is room, with additional running lines. As regards passing loops, we have the possibility of one at Chippenham even using the "spare" platform we have had just sitting there since 1970!
Does anybody know why nobody appears to be even thinking of increasing capacities, instead seeming to waste millions on cosmetic station refurbishments?