This is the original forum of the Bristol Railway Archive that existed between 2003 and 2013. I finally rescued it after it seemed unrecoverable after a large crash. I have made it available for viewing. It is locked, all posts to the new version please!
Mr perks well done you have made my day. Wonderful to see this sort of thing going on. what does amuse me though is the fact that pointwork is coming by road, i can see that causing chaos on its way up the hill to the prison and then down charfield hill.
A few more forom this afternoon and this evening, at Charfield:
[/img]
Sorry about the blur i forgot the tripod for the longer exposure!!
The train in the loop has top and tailed 66's, the one on the up line just a loco at front, when this spoil train was full it pulled foward to about where the far loco is then the looped train pulled from the loop wrong line then backed up to the rear of the other train where it is filled with spoil.
Last edited by tonyperks on Sat Sep 13, 2008 10:45 pm, edited 1 time in total.
The point work still has not arrived, however Charfeild arn't ready for it but yate are, Looks like we are in for a noisey night.
I will get some more shots in the morning or if awake tonight.
excelent range of photos. Not always possible to view this aspect of railways going on.
should be a great opportunity in Bath in october with the up coming works
More work this weekend, Re[lacement busses again between gloucester and bristol,acording to the timetable 1hour Yate - Bristol cant see many takers for that!