Salisbury shed in 1967 after the end of steam, bits of the LSWR main line, and the remainder S&D archive footage:
http://www.youtube.com/watch?v=52w6bgwS ... re=related
First clip appears to be 48706 on the SLS special on 6th March 1966 but I will be happy to be corrected!
http://www.youtube.com/watch?v=1nuWWQoaI3o
More S&D archive footage on You Tube
-
Robin Summerhill
- regular
- Posts: 884
- Joined: Thu Apr 16, 2009 8:19 pm
- Location: Back in Wiltshire again...
- Contact:
-
Robin Summerhill
- regular
- Posts: 884
- Joined: Thu Apr 16, 2009 8:19 pm
- Location: Back in Wiltshire again...
- Contact:
You're quite right - on looking at the clip again there's only three coaches on the trainRoger wrote:The first clip would almost certainly have been a timetabled working during the last weeks of the S&D. The SLS working (as I recall) was 8F + 4MT tank.
We all make mistakes - as the hedgehog said to the scrubbing brush ......